Page 65

shem_en

13. MANAGING FALL RISK Report any defects or damage to the scaffolding to your supervisor or scaffolder. Never work on uninspected scaffolding. Scaffolding must be inspected by a qualified scaffolding inspector just prior to initial use and periodically thereafter as well as after modifications. Never drop any material (e.g. waste) from the scaffold or any other elevated workplace, unless there is a watch person standing on the ground. Scaffolding must have an inspection tag with the following markings: Maximum allowable load Name of the person who has inspected and approved the scaffolding Dates when the scaffolding was inspected and when taken down An example of an inspection card and stop sign: 65


shem_en
To see the actual publication please follow the link above